All 20,516 Heliostats Delivered for 150MW CSP Project in Hami, Xinjiang
HAMI, China — December 30 — Cosin Solar, a key technology partner, has announced the on-schedule…
Tracking Global Long Duration Energy Storage Industry
HAMI, China — December 30 — Cosin Solar, a key technology partner, has announced the on-schedule…
QINGHAI, China — December 29 — The National Energy Group (NEG) has successfully grid-connected its first-ever…
“Two things drive my research forward: the growing installation of renewables and the electrification of…
DELINGHA, China — December 28 — Construction has begun on a landmark 350-megawatt (MW) solar thermal…
The Indian Ministry of Power has issued a directive requiring a minimum 20% local content…