{"id":1323,"date":"2026-02-09T05:57:16","date_gmt":"2026-02-09T05:57:16","guid":{"rendered":"https:\/\/en.esplaza.com.cn\/?p=1323"},"modified":"2026-02-09T05:57:16","modified_gmt":"2026-02-09T05:57:16","slug":"australias-largest-operational-bess-synergy-completes-catl-powered-2400mwh-collie-battery","status":"publish","type":"post","link":"https:\/\/en.esplaza.com.cn\/index.php\/2026\/02\/09\/australias-largest-operational-bess-synergy-completes-catl-powered-2400mwh-collie-battery\/","title":{"rendered":"Australia\u2019s largest operational BESS: Synergy completes CATL-powered 2,400MWh Collie Battery"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/02\/image-14.png\" alt=\"\" class=\"wp-image-1324\" srcset=\"https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/02\/image-14.png 1024w, https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/02\/image-14-300x200.png 300w, https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/02\/image-14-768x512.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>State-owned energy company Synergy has completed the 500MW\/2,400MWh Collie Battery Energy Storage System (CBESS) in Western Australia, establishing Collie as home to Australia\u2019s largest operational battery energy storage system (BESS).<\/p>\n\n\n\n<p>The project, located opposite the Collie Power Station, a 350MW coal-fired power station set to close in 2027, represents more than AU$1.6 billion (US$1.12 billion) in investment through Synergy.<\/p>\n\n\n\n<p>Previous reporting on the battery storage system originally stated the CBESS capacity was 2,000MWh; however, media statements from both the Western Australian government and Synergy indicate this has been increased to 2,400MWh.<\/p>\n\n\n\n<p>In doing so, this means that the CBESS is now, officially, Australia\u2019s largest operational battery storage system, trumping the likes of&nbsp;<a href=\"https:\/\/www.energy-storage.news\/australias-waratah-super-battery-enters-planned-shutdown-amid-transformer-replacement-efforts\/\">Akaysha Energy\u2019s 1,680MWh Waratah Super Battery<\/a>&nbsp;and&nbsp;<a href=\"https:\/\/www.google.com\/url?sa=t&amp;rct=j&amp;q=&amp;esrc=s&amp;source=web&amp;cd=&amp;cad=rja&amp;uact=8&amp;ved=2ahUKEwj20eWW78qSAxV79zgGHXqFAOYQFnoECBMQAQ&amp;url=https%3A%2F%2Fwww.energy-storage.news%2Faustralias-1770mwh-eraring-battery-1-commences-commercial-operations%2F&amp;usg=AOvVaw2uz4XBV3_LeLme8w5RymX5&amp;opi=89978449\">Origin Energy\u2019s 1,770MWh Eraring Battery Stage 1<\/a>, both in New South Wales, and&nbsp;<a href=\"https:\/\/www.energy-storage.news\/neoen-switches-on-2-2gwh-bess-in-western-australia\/\">Neoen\u2019s own Collie Battery, sized at 2,200MWh<\/a>.<\/p>\n\n\n\n<p>CATL, a China-headquartered battery manufacturer, provided its&nbsp;<a href=\"https:\/\/www.energy-storage.news\/western-australia-awards-key-contracts-for-2-8gwh-of-bess-to-catl-power-electronics\/\">EnerC containerised lithium iron phosphate (LFP) BESS solution<\/a>&nbsp;for the Collie project. CATL joined Sungrow and Tesla as AAA-rated energy storage suppliers in&nbsp;<em>PV Tech&nbsp;<\/em>Research\u2019s latest&nbsp;<em><a href=\"https:\/\/marketresearch.solarmedia.co.uk\/reports\/battery-storagetech-bankability-ratings-report\/\">Battery StorageTech Bankability Ratings<\/a><\/em>&nbsp;report.<\/p>\n\n\n\n<p>The CBESS deployment utilises 640 battery containers and 160 inverter units, enabling flexible operation to support grid stability and renewable energy integration.<\/p>\n\n\n\n<p>The system represents the third grid-scale battery energy storage project delivered by the Western Australian government in just over three years.<\/p>\n\n\n\n<p>Indeed, Synergy owns another two utility-scale BESS projects in Western Australia. These are the Kwinana BESS 1, a 100MW\/200MWh 2-hour duration system at the existing gas-fired Kwinana Power Station, and the&nbsp;<a href=\"https:\/\/www.energy-storage.news\/synergy-completes-800mwh-kwinana-bess-in-western-australia\/\">200MW\/800MWh Kwinana BESS 2<\/a>.<\/p>\n\n\n\n<p>Combined with the Collie installation, Synergy\u2019s battery storage portfolio exceeds 3,500MWh of energy storage capacity across Western Australia\u2019s South West Interconnected System (SWIS).<\/p>\n\n\n\n<p>Although Synergy\u2019s CBESS has only just become fully operational, this has not prevented it from playing an important role in various aspects of Australian society.<\/p>\n\n\n\n<p>Ahead of the May 2025 federal election,&nbsp;<a href=\"https:\/\/www.energy-storage.news\/cheap-clean-energy-albanese-visits-2000mwh-collie-bess-project-site-in-western-australia\/\">Prime Minister Anthony Albanese visited the project site to emphasise his support for renewables and energy storage<\/a>. Albanese and the Labor Party then&nbsp;<a href=\"https:\/\/www.google.com\/url?sa=t&amp;rct=j&amp;q=&amp;esrc=s&amp;source=web&amp;cd=&amp;cad=rja&amp;uact=8&amp;ved=2ahUKEwi_1q2o7sqSAxXqwTgGHR3LD0MQFnoECBAQAQ&amp;url=https%3A%2F%2Fwww.energy-storage.news%2Fanthony-albaneses-labor-party-wins-the-2025-australian-federal-election-in-boost-to-renewables-and-storage%2F&amp;usg=AOvVaw2YNdYpfujL8ewUkIRNOrc4&amp;opi=89978449\">went on to win that election<\/a>, beating Peter Dutton and the National-Liberal Coalition, which hedged its bets on nuclear power alongside oil and gas.<\/p>\n\n\n\n<p>Western Australia Premier, Roger Cook, emphasised the project\u2019s role in Western Australia\u2019s energy future.<\/p>\n\n\n\n<p>\u201cCollie has played a vital role in powering Western Australia for decades, and under my government, it will continue to do so. Not only is the town now home to Australia\u2019s biggest batteries, but its future has also been bolstered by our updated Just Transition Plan, which will provide further certainty to the local workforce,\u201d Cook said.<\/p>\n\n\n\n<p>The facility supports the Western Australian government\u2019s commitment to exit state-owned coal-fired power generation by 2030 while maintaining energy security through renewable energy generation and storage infrastructure.<\/p>\n\n\n\n<p>Energy and decarbonisation minister Amber-Jade Sanderson noted: \u201cSynergy\u2019s Collie battery will capture wind and solar generation and use it to power homes when needed. Renewable energy generation and storage backed by gas is the least-cost energy mix for households and businesses and will put downward pressure on prices.\u201d<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-collie-the-home-of-some-of-australia-s-largest-battery-storage-systems\"><strong>Collie: the home of some of Australia\u2019s largest battery storage systems<\/strong><\/h2>\n\n\n\n<p>The Collie region continues attracting battery energy storage investment, with&nbsp;<em>Energy-Storage.news<\/em>&nbsp;reporting a few weeks ago on&nbsp;<a href=\"https:\/\/www.energy-storage.news\/third-utility-scale-battery-storage-project-proposed-for-western-australias-collie\/\" target=\"_blank\" rel=\"noreferrer noopener\">a third utility-scale battery storage project proposed for the area<\/a>, sized at 200MW. The duration of this proposed battery storage system has not been disclosed.<\/p>\n\n\n\n<p>One of these projects, Neoen\u2019s 2,200MWh Collie battery storage system, was&nbsp;<a href=\"https:\/\/url.us.m.mimecastprotect.com\/s\/pkvoCqxV2vtzKlmDMSZfQHEeYsv?domain=energy-storage.news\/\">switched on last year<\/a>. Stage 1 of the Collie BESS, sized at 219MW\/877MWh, began operating in October 2024, less than 18 months after construction commenced.<\/p>\n\n\n\n<p>Building on the success of Stage 1, Neoen completed the second stage of the Collie Battery in August 2025, adding 341MW\/1,363MWh. The BESS project utilises Tesla Megapack 2XL units.<\/p>\n\n\n\n<p>Tesla is also&nbsp;<a href=\"https:\/\/www.energy-storage.news\/tesla-inks-mou-for-megapack-re-manufacturing-facility-in-western-australia\/\">exploring a battery re-manufacturing facility<\/a>&nbsp;near the Collie battery sites, potentially establishing additional industrial capacity in the region. This would initially service a range of battery products in Western Australia and the wider Asia-Pacific region.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-owned energy company Synergy has completed the 500MW\/2,400MWh Collie Battery Energy Storage System (CBESS) in&hellip;<\/p>\n","protected":false},"author":2,"featured_media":1324,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-1323","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project"],"_links":{"self":[{"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/posts\/1323","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/comments?post=1323"}],"version-history":[{"count":1,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/posts\/1323\/revisions"}],"predecessor-version":[{"id":1325,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/posts\/1323\/revisions\/1325"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/media\/1324"}],"wp:attachment":[{"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/media?parent=1323"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/categories?post=1323"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/tags?post=1323"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}