{"id":1655,"date":"2026-04-01T02:50:22","date_gmt":"2026-04-01T02:50:22","guid":{"rendered":"https:\/\/en.esplaza.com.cn\/?p=1655"},"modified":"2026-04-01T02:50:22","modified_gmt":"2026-04-01T02:50:22","slug":"hithium-signs-3-gwh-long-duration-storage-deal-with-brawn-capital","status":"publish","type":"post","link":"https:\/\/en.esplaza.com.cn\/index.php\/2026\/04\/01\/hithium-signs-3-gwh-long-duration-storage-deal-with-brawn-capital\/","title":{"rendered":"Hithium signs 3 GWh long-duration storage deal with Brawn Capital"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/04\/image-2-1024x768.png\" alt=\"\" class=\"wp-image-1656\" srcset=\"https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/04\/image-2-1024x768.png 1024w, https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/04\/image-2-300x225.png 300w, https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/04\/image-2-768x576.png 768w, https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/04\/image-2-1536x1152.png 1536w, https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/04\/image-2.png 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Chinese multinational Hithium has signed a deal with Brawn Capital to deliver 3 GWh of long-duration energy storage (LDES) capacity by 2030, alongside a slate of other project collaborations.<\/p>\n\n\n\n<p>The deal with Asia-Pacific investor Brawn Capital covers multiple energy storage systems with different durations.<\/p>\n\n\n\n<p>Long-duration energy storage appears to be an increasing focus for Hithium. The Chinese manufacturer entered a similar 2 GWh long-duration agreement recently reached with KNESS Group for the&nbsp;<a href=\"https:\/\/www.ess-news.com\/2026\/02\/10\/hithium-to-deliver-2-gwh-of-long-duration-storage-to-ukraine\/\">Ukranian market.<\/a>&nbsp;Brawn Capital is expected to bring local expertise to the partnership, as a seasoned investor in Asia-Pacific renewables projects with offices in Hong Kong and Singapore<\/p>\n\n\n\n<p>Announcing the Brawn Capital deal, Hithium revealed approximately 20 ultra-high voltage (UHV) projects have entered the preparation phase, while 300 MWh of energy storage projects are scheduled for delivery in 2027.<\/p>\n\n\n\n<p>The cooperation agreement covers multiple energy storage system solutions of different durations, according to Hithium, including the manufacturer\u2019s recently unveiled 10-foot<a href=\"https:\/\/www.ess-news.com\/2026\/02\/09\/hithium-says-it-completed-worlds-first-open-door-first-test-of-6-25-mwh-bess\/\">&nbsp;\u201c\u221ePower\u201d<\/a>&nbsp;Flexsso 3.125 MWh and 6.25 MWh energy storage system.<\/p>\n\n\n\n<p>Hithium said the deal marks a \u201ckey step forward\u201d for the business in the large-scale application of long-duration energy storage and the expansion of the Asia-Pacific market.<\/p>\n\n\n\n<p>The Brawn Capital deal also follows Hithium\u2019s decision to invest around \u20ac400 million ($458 million) in a&nbsp;<a href=\"https:\/\/www.ess-news.com\/2026\/03\/11\/hithium-to-invest-e400-million-in-spanish-mega-battery-factory\/\">Spanish battery factory.&nbsp;<\/a>The March 2026 announcement saw Hithium commit to a join venture with public company Sodena to develop a facility that could be operational in early 2027.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Chinese multinational Hithium has signed a deal with Brawn Capital to deliver 3 GWh of&hellip;<\/p>\n","protected":false},"author":2,"featured_media":1656,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-1655","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company"],"_links":{"self":[{"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/posts\/1655","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/comments?post=1655"}],"version-history":[{"count":1,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/posts\/1655\/revisions"}],"predecessor-version":[{"id":1657,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/posts\/1655\/revisions\/1657"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/media\/1656"}],"wp:attachment":[{"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/media?parent=1655"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/categories?post=1655"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/tags?post=1655"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}