{"id":1875,"date":"2026-05-12T07:57:25","date_gmt":"2026-05-12T07:57:25","guid":{"rendered":"https:\/\/en.esplaza.com.cn\/?p=1875"},"modified":"2026-05-12T07:57:25","modified_gmt":"2026-05-12T07:57:25","slug":"royal-tech-csps-next-generation-csp-technology-industrialization-base-in-nanchong-reaches-major-construction-milestone","status":"publish","type":"post","link":"https:\/\/en.esplaza.com.cn\/index.php\/2026\/05\/12\/royal-tech-csps-next-generation-csp-technology-industrialization-base-in-nanchong-reaches-major-construction-milestone\/","title":{"rendered":"Royal Tech CSP\u2019s Next-Generation CSP Technology Industrialization Base in Nanchong Reaches Major Construction Milestone"},"content":{"rendered":"\n<p>On May 11, the new-generation CSP technology industrialization base invested and developed by Royal Tech CSP in Nanchong, Sichuan Province, successfully reached its structural topping-out milestone. The project has now entered a new phase of construction, laying a solid foundation for the subsequent installation and commissioning of production line equipment.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/05\/61e8b90d89530e29eff3aea7a3286ee5-1024x576.jpg\" alt=\"\" class=\"wp-image-1876\" srcset=\"https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/05\/61e8b90d89530e29eff3aea7a3286ee5-1024x576.jpg 1024w, https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/05\/61e8b90d89530e29eff3aea7a3286ee5-300x169.jpg 300w, https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/05\/61e8b90d89530e29eff3aea7a3286ee5-768x432.jpg 768w, https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/05\/61e8b90d89530e29eff3aea7a3286ee5.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>At the project site in Jialing District, Nanchong, Royal Tech CSP is establishing production lines for next-generation ultra-large curved tempered double-glass reflector mirrors and ultra-low heat-loss large-aperture receiver tubes. The company will also collaborate with major research institutes and universities to jointly carry out multiple R&amp;D and pilot-scale demonstration projects.<\/p>\n\n\n\n<p>As modularized standard equipment, parabolic trough collector systems can be scaled up extensively after industrialization in a manner similar to photovoltaic arrays. The 600 MW Dubai CSP project, for example, achieved the world\u2019s first trough solar field deployment at the scale of 8 million square meters. Meanwhile, trough collector systems can also be deployed in distributed applications for industrial green heat, steam supply, and residential heating, enabling deep integration across a wide range of low-carbon energy scenarios.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/05\/7990138a8c71e5eaa2f169e4d4244d93-1024x576.jpg\" alt=\"\" class=\"wp-image-1877\" srcset=\"https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/05\/7990138a8c71e5eaa2f169e4d4244d93-1024x576.jpg 1024w, https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/05\/7990138a8c71e5eaa2f169e4d4244d93-300x169.jpg 300w, https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/05\/7990138a8c71e5eaa2f169e4d4244d93-768x432.jpg 768w, https:\/\/en.esplaza.com.cn\/wp-content\/uploads\/2026\/05\/7990138a8c71e5eaa2f169e4d4244d93.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Following commissioning, the project will further optimize the mature RT86 collector design into the upgraded RT86G2 model, improving interception accuracy while significantly reducing installation time. The project will also provide a strong foundation for the R&amp;D and demonstration of the next-generation ultra-large trough collector, the RT1XX series.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On May 11, the new-generation CSP technology industrialization base invested and developed by Royal Tech&hellip;<\/p>\n","protected":false},"author":2,"featured_media":1876,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,2],"tags":[],"class_list":["post-1875","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company","category-project"],"_links":{"self":[{"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/posts\/1875","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/comments?post=1875"}],"version-history":[{"count":1,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/posts\/1875\/revisions"}],"predecessor-version":[{"id":1878,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/posts\/1875\/revisions\/1878"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/media\/1876"}],"wp:attachment":[{"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/media?parent=1875"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/categories?post=1875"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/en.esplaza.com.cn\/index.php\/wp-json\/wp\/v2\/tags?post=1875"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}