April 15, 2026 (GLOBE NEWSWIRE) — Eos Energy Enterprises, Inc. (NASDAQ: EOSE) (“Eos” or the “Company”), an American energy company and the leading innovator in designing, sourcing, manufacturing, and providing zinc-based battery energy storage systems (BESS), and TURBINE‑X Energy, Inc. (“TURBINE‑X”), a developer and integrator of large-scale, behind-the-meter gas-fired power infrastructure, today announced a Joint Development Agreement (JDA) to develop and deploy private power infrastructure for AI, a new model designed to deliver firm, dispatchable energy for hyperscale data centers and other mission-critical loads on accelerated timelines.
As AI infrastructure scales, power has moved onto the critical path. Hyperscale developers increasingly require capacity on timelines measured in months, not years—a need that is not aligned with traditional grid development cycles. The Eos and TURBINE-X solution is purpose-built for this shift, integrating gas-fired generation with Eos’ Indensity™ battery architecture to deliver reliable, on-site power at the speed and scale AI infrastructure demands.
This integrated system combines simple-cycle turbine generation with high-density, fast-response energy storage, creating a fully engineerable power solution designed specifically for constrained, high-load environments such as AI campuses. With millisecond-class storage response and high energy density within a compact footprint, the platform supports both immediate power availability and the dynamic load profiles associated with AI training and inference workloads.
Commercial Pipeline and Deployment Scale
Under the JDA, TURBINE-X is targeting up to 2 GWh of Eos storage systems across a defined project pipeline over the next 36 months, with initial deployments targeted for 2027.
“Our customers need power delivered on accelerated timelines,” said Michael Warneboldt, CEO of X-Group of Companies. “By integrating our generation capabilities with Eos storage, we can deliver a fully dispatchable, engineered solution that meets the scale and reliability requirements of hyperscale infrastructure. The JDA provides the structure and accountability to move quickly and execute.”
The current pipeline includes multiple large-scale projects in active development, each designed to support multi-hundred-megawatt deployments per site, with additional opportunities under evaluation. Projects will advance under jointly defined milestones, performance criteria, and customer requirements, governed by a Development Advisory Committee established under the agreement.
A New Model for Power Infrastructure
Private power infrastructure, sometimes described as “Bring Your Own Power” (BYOP), is emerging as a new category within energy markets, as large-load customers increasingly prioritize speed, control, and reliability in how power is sourced and deployed.
By combining TURBINE-X’s experience in complex behind-the-meter gas-fired generation with Eos’ Indensity architecture, engineered for high-density deployment in space-constrained environments, the platform establishes a repeatable model for delivering large-scale power capacity independent of traditional development timelines.
Engineering, siting, and customer engagement efforts are already underway across multiple projects, reflecting a shared focus on execution and near-term delivery.
“Power is now on the critical path,” said Justin Vagnozzi, Eos SVP of Technical Sales & Commercial Operations. “This partnership establishes a new model for private power infrastructure, purpose-built for AI. TURBINE-X brings proven execution capability in gas-fired generation, and our Indensity architecture delivers more energy in less space with the response speed these environments require. We are actively developing projects and advancing a shared commercial pipeline.”
About Eos Energy Enterprises
Eos is accelerating the shift to American energy independence with positively ingenious solutions that transform how the world stores power. The Company’s BESS features the innovative Znyth™ technology, a proven chemistry with readily available non-precious earth components, that is the pre-eminent safe, non-flammable, secure, stable, and scalable alternative to conventional technology. The Company’s BESS is ideal for utility-scale, microgrid, commercial, and industrial long-duration energy storage applications (i.e., 4 to 16+ hours) and provides customers with significant operational flexibility to cost effectively address current and future increased grid demand and complexity. For more information about Eos (NASDAQ: EOSE), visit eose.com.
About TURBINE-X
TURBINE-X is a power solutions company focused on delivering modular, vendor-neutral, and cross-platform energy systems. Specializing in grid-independent and behind-the-meter applications, TURBINE-X works with industrial, commercial, and infrastructure partners to remove power constraints and transform energy strategy into a competitive advantage. Learn more at x-group.com.