Skip to content

ESPLAZA LDES Network

Tracking Global Long Duration Energy Storage Industry

  • Home
  • Headline
  • Policy
  • Company
  • Project
  • Technology
  • Insight
  • Research
  • Conference

Day: October 20, 2025

Offgrid Energy Labs eyes grid-scale role as UK LDES factory advances
CompanyInsight

Offgrid Energy Labs eyes grid-scale role as UK LDES factory advances

As work on a 10-MWh demonstration manufacturing facility in the UK is advancing, India-headquartered long-duration…

5 MWh TWEST Unit Successfully Manufactured and Shipped to Pharmaserv
CompanyProject

5 MWh TWEST Unit Successfully Manufactured and Shipped to Pharmaserv

E2S Power proudly announces the successful completion and shipment of its first Thermal Energy Storage…

Meine Electric: Long Duration Energy Storage to Empower 100% RE Grids
CompanyTechnology

Meine Electric: Long Duration Energy Storage to Empower 100% RE Grids

It is no secret that wind + solar + storage is now substantially cheaper than…

Why energy storage is increasingly dictating data center site selection  
Insight

Why energy storage is increasingly dictating data center site selection  

In Texas, a new kind of reliability standard is reshaping where data centers choose to…

Good News, Bad News As Rondo Energy 100 MWh Heat Storage Facility Goes Live
CompanyTechnology

Good News, Bad News As Rondo Energy 100 MWh Heat Storage Facility Goes Live

First the good news. Rondo Energy has developed technology that uses electricity — preferably from renewable energy…

Recent Posts

  • Meine Electric Raises USD 750,000 Pre-Seed Funding to Scale Iron Air Long Duration Energy Storage Technology
  • European energy sector urges EU to fast-track long-duration energy storage
  • Long-duration energy storage costs declining, European policymakers urged to make ‘strategic choice’  
  • Rondo Energy, Covestro break ground on 100MWh thermal energy storage site in Germany
  • Noon Energy demonstrates 100+ hour ultra-long-duration energy storage system
  • $97M boost for Sage Geosystems’ pioneering geothermal energy plant
  • UK developers grappling with grid connection reform and LDES scheme implications
  • After the SPAC: Why storage company Energy Vault pivoted after going public
  • Georgia Co-op Pilots Cutting-Edge Long-Duration Energy Storage Technology
  • Largo Inc stock: Quiet consolidation or value trap after a bruising year for vanadium play LGO?

About Us:

ESPLAZA Long-Duration Energy Storage Network is the most professional and sole industry information and business media platform in China's long-duration energy storage industry, boasting profound influence and extensive industry resources within the industry.The China Long-Duration Energy Storage Conference hosted by ESPLAZA has grown into the largest-scale and most professional annual event in the industry, and is renowned as the "barometer and vane" of the long-duration energy storage industry.

October 2025
M T W T F S S
 12345
6789101112
13141516171819
20212223242526
2728293031  
« Sep   Nov »

Contact Us:

Email:Catherine@esplaza.com.cn
Room 1109A, Huasheng International Building, No. 12, Yabao Road, Jianguomen, Chaoyang District, Beijing, China

The 3rd China Long-Duration Energy Storage Conference

Copyright © 2026 ESPLAZA LDES Network | Powered by https://www.esplaza.com.cn | All Rights Reserved.