Skip to content

ESPLAZA LDES Network

Tracking Global Long Duration Energy Storage Industry

  • Home
  • Headline
  • Policy
  • Company
  • Project
  • Technology
  • Insight
  • Research
  • Conference
Top News
Overview of Operational and Under-Construction CSP Projects in China
Free! Invitation to the 13th China International CSP Conference&CSPPLAZA Annual Conference
Free VIP Invite to the 13th China International CSP Conference & CSPPLAZA Annual Conference
China targets 15 GW of solar thermal power capacity by 2030
The world’s first LNG-integrated Liquid Air Energy Storage (LAES) plant has achieved its first synchronization with the Japanese grid in Hiroshima, Japan,
HeadlineProject

Overview of Operational and Under-Construction CSP Projects in China

Headline

Free! Invitation to the 13th China International CSP Conference&CSPPLAZA Annual Conference

Headline

Free VIP Invite to the 13th China International CSP Conference & CSPPLAZA Annual Conference

HeadlinePolicy

China targets 15 GW of solar thermal power capacity by 2030

Hot News

CompanyProject

ESS Announces Agreement to Join Salt River Project and Google Long Duration Energy Storage Collaboration

CompanyProject

Alfa Laval partners with the Institute for Advanced Engineering to advance liquid air energy storage in South Korea

Project

China Nuclear Huaneng Jinta 1.6 Million kW Wind, Solar, and Thermal Storage Project Achieves 25% Progress in Civil Construction of the Steam Supply Station

CompanyProject

Brenmiller Energy Completes Construction of its First Commercial Scale Boiler Replacement Project, Advancing 360BNRG Strategy

CompanyProject

Global giant Tata Steel is using a heat battery to curb emissions

ENGIE awarded 200 MW solar project with 100 MW/600 MWh battery storage by SECI
Project

ENGIE awarded 200 MW solar project with 100 MW/600 MWh battery storage by SECI

ENGIE has secured a 200 MW solar project paired with a 100 MW/600 MWh battery…

Who’s driving the 300GWh boom in demand for AI data centre battery storage?
CompanyInsight

Who’s driving the 300GWh boom in demand for AI data centre battery storage?

With the global AI data centre boom already here and growing rapidly, HiTHIUM brings products…

Global Concentrated Solar Power Installed Capacity Reaches 8,707 MW by 2025
InsightResearch

Global Concentrated Solar Power Installed Capacity Reaches 8,707 MW by 2025

According to statistics from CSPPLAZA, the global installed capacity of concentrated solar power (CSP) increased…

Chile approves 1 GWh battery as another 5 GWh project seeks approval
Project

Chile approves 1 GWh battery as another 5 GWh project seeks approval

Chile’s Environmental Assessment Service (SEA) has approved the Environmental Qualification Resolution (RCA) for the 200…

Autonomous discovery-driven Argonne study inspires paradigm shift in battery research
ResearchTechnology

Autonomous discovery-driven Argonne study inspires paradigm shift in battery research

In numerous scientific fields, high-throughput experimentation methods combined with artificial intelligence (AI) show great promise to accelerate…

1.46 Billion kWh! Annual Power Generation Hits Record High at CGN Delingha 50MW CSP Plant
Project

1.46 Billion kWh! Annual Power Generation Hits Record High at CGN Delingha 50MW CSP Plant

In 2025, the annual grid-connected electricity generated by the CGN Delingha 50MW Concentrated Solar Power…

CEEC CEPEC-Led Solar Thermochemical Hydrogen Production Project Approved
Project

CEEC CEPEC-Led Solar Thermochemical Hydrogen Production Project Approved

Recently, the national key research and development plan intergovernmental international scientific and technological innovation cooperation…

Enters Joint Commissioning Phase! CGN Delingha 200MW Solar Thermal Project Ready for Grid Connection
Project

Enters Joint Commissioning Phase! CGN Delingha 200MW Solar Thermal Project Ready for Grid Connection

Recently, the 200MW solar thermal component of CGN Delingha 1,000MW Photovoltaic-Solar Thermal Project has been…

Overview of Awarded Solar Thermal/Molten Salt Thermal Storage Projects and Contractors in December 2025
Project

Overview of Awarded Solar Thermal/Molten Salt Thermal Storage Projects and Contractors in December 2025

December 2025 saw significant progress in both concentrated solar power (CSP) and molten salt thermal…

All Foundation Work for Mirror Field Completed! Tibet Antuo 100MW Solar Thermal Project Advances Winter Construction as Scheduled
Project

All Foundation Work for Mirror Field Completed! Tibet Antuo 100MW Solar Thermal Project Advances Winter Construction as Scheduled

At the construction site of the Tibet Antuo Soil-Shuo 100MW solar thermal + 800MW photovoltaic…

Posts pagination

Previous 1 … 8 9 10 … 35 Next

Recent Posts

  • China’s First Provincial-Level CSP Policy Released
  • ESS Announces Agreement to Join Salt River Project and Google Long Duration Energy Storage Collaboration
  • Alfa Laval partners with the Institute for Advanced Engineering to advance liquid air energy storage in South Korea
  • China Nuclear Huaneng Jinta 1.6 Million kW Wind, Solar, and Thermal Storage Project Achieves 25% Progress in Civil Construction of the Steam Supply Station
  • Brenmiller Energy Completes Construction of its First Commercial Scale Boiler Replacement Project, Advancing 360BNRG Strategy
  • Global giant Tata Steel is using a heat battery to curb emissions

About Us:

ESPLAZA Long-Duration Energy Storage Network is the most professional and sole industry information and business media platform in China's long-duration energy storage industry, boasting profound influence and extensive industry resources within the industry.The China Long-Duration Energy Storage Conference hosted by ESPLAZA has grown into the largest-scale and most professional annual event in the industry, and is renowned as the "barometer and vane" of the long-duration energy storage industry.

March 2026
M T W T F S S
 1
2345678
9101112131415
16171819202122
23242526272829
3031  
« Feb    

Contact Us:

Email:Catherine@esplaza.com.cn
Room 1109A, Huasheng International Building, No. 12, Yabao Road, Jianguomen, Chaoyang District, Beijing, China

The 3rd China Long-Duration Energy Storage Conference

Copyright © 2026 ESPLAZA LDES Network | Powered by https://www.esplaza.com.cn | All Rights Reserved.